Quote

Repointing - Needs access to chimney

Open to quotes
Scaffold to repoint Chimney
Scaffold to repoint Chimney

Add your quote

8 Quotes

Terraced house - Two floors. Access to chimney would require 1 side of scaffolding to be as high as the highest point on the roof. we want to have a tower built (3 m by 8metres) for the front of the house an then taken to the back to repoint another chimney.
- Szabos02
Building Dimensions
5m wide, 8m high
5m wide, 5m high
Access Restrictions Scaffold would have to be taken through the house.
Obstacles No
Location London (sw17)
Start Some time in August
Lasts 2 weeks
Posted By Szabos02 (4th Jul)

Ask a question