Scaffolding Enquiry posted by Jean-Charles on 2010-07-21 |
-fully boarded and enclosed scaffold
-cantilevered access to party walls on the rear (Side 2) to avoid scaffolding from ground
- Temporary Roof
- Debris netting
- Temporary scaffolding staircase
- Scaffold alarm system
* at the front we would like the scaffold to be built from the terrace if possible* (hieght is 10m to roof edge). Otherwise the hieght is about 18 metres.
-cantilevered access to party walls on the rear (Side 2) to avoid scaffolding from ground
- Temporary Roof
- Debris netting
- Temporary scaffolding staircase
- Scaffold alarm system
* at the front we would like the scaffold to be built from the terrace if possible* (hieght is 10m to roof edge). Otherwise the hieght is about 18 metres.
- Jean-Charles
| Deliver To | SW10 |
| Rental Period | From 2010-09-01 for 6 months |
| Building dimensions |
5.6m wide, 22.0m high 5.6m wide, 10.0m high |
| Obstacles | Scaffold will be taken to the rear from the second or third floor window. |
| Public footpath? | No |